Lo Sheng (樂生) was mentioned on the Country Reports on Human Rights Practices.
During the year, activists petitioned the authorities to preserve the Lo Sheng leprosy sanatorium and to allow its residents to continue living there. Most of the Lo Sheng site was to be demolished to make way for a rapid mass transit depot. In May the Public Construction Commission (PCC) decided to preserve half of the site's original buildings and to relocate the remaining residents to an adjoining high-rise long term care facility, which was not acceptable to the residents. Disability rights activists charged the PCC with putting development before the rights of the disabled. The authorities asserted that an appropriate balance had been reached between competing interests. In November the LY approved a $28 million (NT$900 million) fund to compensate residents for decades of confinement at the facility. However, the LY did not designate the Lo Sheng facility as a protected historical site, as activists had requested.
原文請見 http://www.state.gov/g/drl/rls/hrrpt/2007/100517.htm
沒有留言:
張貼留言